Articles · Government
Building permits in Armstrong and Spallumcheen, BC: where to start
Published · Updated · By Mary Jane Howie
Building a house, a shop, a deck, or an addition near Armstrong starts with one question. Which local government covers your lot? The City of Armstrong and the Township of Spallumcheen each run their own permit process. This page says who to call, what to ask, and which approvals sit outside the building permit.
Find the right office
Your property address decides which government applies. Some Armstrong mailing addresses sit inside Spallumcheen. Check before you call. Our guide to which municipality your address is in shows how.
City of Armstrong. City Hall is at 3570 Bridge Street. The phone number is 250-546-3023.
Township of Spallumcheen. The Township office is at 4144 Spallumcheen Way. The phone number is 250-546-3013.
Staff at either office can say whether your project needs a permit. Hours, fees, and forms change, so confirm them by phone before you visit.
Work to ask about
Rules differ by size and use. Ask the office about each of these before you buy materials or hire a crew:
- A new house or a manufactured home
- An addition or a second storey
- A garage, a shop, or a barn
- A secondary suite
- A deck, a covered porch, or stairs
- A retaining wall
- A wood stove or fireplace
- Moving walls, or changing the use of a building
Some small jobs may not need a permit. Staff can tell you which ones. Do not guess.
Check zoning first
A building permit depends on zoning. Zoning sets what you can build, how big it can be, and how far it must sit from the property line. Those distances are called setbacks.
Ask these questions on your first call:
- What is the zoning on my lot?
- What are the setbacks for the building I plan?
- Is there a height or size limit?
- Is my lot in a flood area, a steep slope area, or another special zone?
Ask for the answers in writing if the office can provide them. Do this before you pay for drawings.
What to bring
Ask the office what the application needs. Most applications call for the property address, the legal description of the lot, and a site plan that shows where the building will sit. Larger projects may call for drawings. Some call for a design by an architect or engineer. The office will say what your project requires.
Farm land in Spallumcheen
Much of the land in Spallumcheen is farm land, and some of it sits inside the Agricultural Land Reserve. The Agricultural Land Commission sets limits on what can be built on that land. The Township applies its own zoning on top.
A farm building, a second house on a farm lot, and a farm stand each raise their own questions. Ask the Township before you start. Our list of farm stands in Armstrong and Spallumcheen shows how some local growers have set up.
Septic systems and wells
Many rural lots near Armstrong have no city sewer or water line. A new home on one of those lots needs a septic system and a water source.
In BC, a registered professional designs a new septic system and files it with the health authority. Here, that is Interior Health. This step runs alongside the building permit and does not replace it. Our guide to well water and septic systems in Spallumcheen covers the first steps.
Electrical and gas permits
Electrical and gas work falls under Technical Safety BC. A licensed contractor usually pulls these permits. Homeowners who do their own work should ask Technical Safety BC what applies. Ask the municipal office about plumbing, because the local government handles it.
Our list of plumbers, electricians, and roofers in Armstrong names local trades.
Hiring a contractor
Ask your contractor who applies for the permit. The permit holder is responsible for the work, so get the answer before you sign. Also ask for these:
- A municipal business licence for the area where the work happens
- WorkSafeBC coverage
- A written contract that names the permit
Our list of construction companies in Armstrong is a place to start. Contractors who work in several towns may hold more than one licence. See our guide to business licences in Armstrong and Spallumcheen for how that works.
Call before you dig
Digging for a foundation, a trench, or a post hole can hit buried lines. Call BC 1 Call before you dig to have underground utilities located. The service is free to the caller. If you hire an excavator, ask who makes that call. Our list of excavation, gravel, and concrete companies in Armstrong names local firms.
Inspections
A permit comes with inspections at set stages. The building inspector must see certain work before it is covered up. Ask the office which stages need an inspection and how much notice to give.
Work without a permit
Unpermitted work can cause trouble later. A buyer, a lender, or an insurer may ask for proof that past work was permitted. Fixing the problem after the fact can cost more than applying first.
Is a phone number, address, or rule here out of date? Send us a tip and we will fix it.